Bethania station precinct

The Bethania station precinct is being upgraded to improve accessibility, safety, and customer experience.

As part of the tender process for the Logan and Gold Coast Faster Rail (LGC) package, the Department of Transport and Main Roads (TMR) asked proponents to innovate and consider options to address prior community feedback. As a result, TMR has adopted a design that elevates Bethania station above Station Road and removes the need for a road-over-rail bridge.

This updated design significantly reduces impacts on important community facilities, nearby properties and Station Road, and provides easier access for everyone across the rail corridor.

Bethania station upgrade

The Bethania station upgrade is being delivered as part of the LGC Rail package. The scope of works for the LGC Rail package will double the tracks from two to four between Kuraby and Beenleigh, deliver modern and accessible stations, remove level crossings, improve park 'n' ride facilities, and improve access and connectivity along the complex 20-kilometre project corridor.

Drop-in information sessions are also being hosted to provide an opportunity to ask questions and speak to our team, one-on-one. The dates, times and locations of upcoming sessions are listed on the right-hand side of this page.

Make sure you have your say before Sunday 12 October.

Bethania station design solution

Key design features

  • Connectivity and accessibility

    • Improved cross-corridor community connectivity to important local facilities, including Bethania Waters Shopping Centre, Noffke Park, and Bethania Community and Aquatic Centres.
    • Improved connections to the station including signalised pedestrian crossing on Station Road.
  • Local roads and traffic conditions

    • Elevated station eliminates the Station Road level crossing at Bethania.
    • Local road network remains largely unchanged.
    • Retained cross corridor emergency access from Radke Road during flood events.
  • Community amenity

    • Significantly reduced impacts to Noffke Park facilities, including Bethania community and aquatic centres.
    • Elevated station over Station Road:
      • provides new civic space opportunities.
      • supports precinct development.

Provide a short summary of your question.

You have 150 characters left

Provide detailed information relating to your question.

You have 500 characters left

Select a respondent from the list that you would most like to answer your question.

Moderation Policy

These are the people that are listening and responding to your questions.

Logan & Gold Coast Faster Rail team

{{ question.username }} asked

{{question.description}}

{{ answer.respondent.name }}
| Edited

Answer this question

Select the respondent who will be marked as answering the question

Provide the answer to the question. Answer can be saved as draft and published when complete.

No questions found

News and updates

  • Community information sessions underway

    Learn more about the design solution at Bethania.

    The dates, times, and locations of upcoming information sessions are listed on the right-hand side of this page.