Overview
Stage 2 is currently in the design phase, with additional funding required for construction.
Key features:
- providing collector-distributor roads on either side of the Bruce Highway that link Dohles Rocks Road with the Gateway Motorway and Gympie Arterial Road
- 2 new Pine River bridges for the collector-distributor roads
- extending the shared active transport pathway along the Bruce Highway
- corridor north over the Pine River to Dohles Rocks Road
- fauna underpass on the north side of the Pine River bridges.