In the next 20+ years, what do you consider is the highest transport need for the Toowoomba network?

Share your thoughts on the proposed Toowoomba North South Transport Corridor.

Share your thoughts below and vote on (like/dislike) other comments. Information provided in this section will be publicly displayed on the feedback wall (max 140 characters).

30 September, 2023

SSmith says:

The number of intersections indicated on the map will increase travel time, not reduce it. Significant impact on community and local roads

30 September, 2023

SSmith says:

Incredibly disappointed by the conduct of TMR and the minister throughout this consultation. Listen to the community and address concerns

30 September, 2023

SSmith says:

This project will not address stated aims, but will destroy communities and the environment. I strongly oppose the proposal

30 September, 2023

toowoombaresident says:

Duplicates existing infrastructure, impacts local roads and communities and has significant environmental impacts. Unnecessary and unwanted

30 September, 2023

toowoombaresident says:

This is a notification process, not a consultation process. Address the community concerns and engage properly Mr Bailey.

30 September, 2023

toowoombaresident says:

Why has Mr Bailey not organised a community forum to really listen to affected residents? Is it because he has already made up his mind?

30 September, 2023

toowoombaresident says:

Meeting other government representatives during a secret trip to Toowoomba is not effective community consultation Mr Bailey.

28 September, 2023

Jess.sawtell says:

We strongly oppose the proposed new corridor. People in highfields accept the longer commute. This will ruin family homes. Upgrade old roads

23 September, 2023

Betty523 says:

I understand it goes through the less populated area of Koala habitat but what measures are in place to protect those that do live there?

21 September, 2023

Astromainiac says:

Don't make it a toll road. Stop privatising publicly funded projects and then getting tax payers to pay for it again.

20 September, 2023

Ehoek says:

I don't think this road is necessary, I don't like the amount of nature reserve that it will go through.

16 September, 2023

JohnDwyer says: